The pre-delivery inspection checklist

The pre-delivery inspection is mandatory for a building covered by the Garantie de construction résidentielle (GCR): you walk through the unit with the contractor and note on the GCR form everything to finish or fix. You then have 3 days to add an apparent defect, if you have not moved in.

GCR rules checked on November 20, 2026.

0 items checked · saved in this browser only

Entry and hallways

Kitchen

Bathroom

Windows and doors

Electrical and mechanical

Extras and documents

What GCR says

To check that your furniture fits the rooms before delivery, try Will my furniture fit?.

Frequently asked questions

Is the pre-delivery inspection mandatory?

Yes, for any building covered by the guarantee plan for new residential buildings, administered by GCR. Without a signed form, GCR does not issue a warranty certificate.

How long do I have to report a defect I missed?

3 days after the inspection for an apparent defect, if you have not moved in. After that, the warranty covers poor workmanship that was not apparent for 1 year and hidden defects for 3 years.

Should I hire an inspector?

It is not mandatory, but GCR lets you bring a building professional. They often spot what a buyer does not.

See this plan furnished

Open the demo project: every unit, every room, furnished in several styles, from the plan.

Open the demo →

For developers

Add this tool to your project’s page, in your colours, next to the “See it furnished” module.

Add this tool to your project →

Sources

Checked on November 20, 2026. The checklist items are a seee aide-memoire, not a GCR document.